
Construction time:2020            Completion time:2021            Project area: 205,000㎡            Volume of steel:3400t
Project description:Capacity: 82,000 seats; Retractable roof area: 6,000t; String truss and space frame structure; Intergral lifting: 4,400t weight and 60m height; Work scope: shop drawing, fabrication, erection of steel structure and retractable roof system.
Bright spot:Retractable roof stadium